PBPrint Batch Fieldbook

Print Batch Fieldbook

Methods and worked example

The exact calculation, assumptions, rounding and limits behind the free tool.

Quantity and cost formulas

Estimated usable quantity = floor(run quantity × (1 − assumed unusable percentage ÷ 100)). Minimum run = the smallest whole quantity that produces the usable requirement under that formula. Entered cost = run quantity × entered per-piece price + setup + shipping + other entered costs. Cost per usable piece = entered cost ÷ estimated usable quantity, or not defined if estimated usable quantity is zero.

Read the worked example

The target is 150 usable pieces. Quote A orders 200 at $0.25 with $20 setup and $10 shipping. Total cost is $80 and the 5% waste scenario leaves 190 usable. Quote B orders 150 at $0.30 with $15 setup and $10 shipping. Its $70 total is smaller, but its 142 estimated usable pieces are eight short. The minimum run under the scenario is 158 pieces.

What this does not model

Waste is an entered scenario, not a measured industry rate. Supplier quantity tolerances, delivery replacements, minimum order packs and changes to specifications are not inferred. Compare quotes with the same tax basis; include known taxes or other charges consistently in the other-cost field. The tool does not inspect artwork, calculate sheet imposition, recommend printers or determine rights under a contract.

Rounding

Run quantities and requirements must be whole pieces. Usable output is conservatively rounded down; required run size is rounded up. Currency is displayed to two decimals while calculations retain numerical precision. A downloaded CSV can contain more decimal places than the screen. Record supplier packaging increments separately before placing an order.

Testing and corrections

The publication includes constructed examples designed to be reproducible. If a result looks wrong, note the inputs, the result and the outcome you expected, then contact the publisher. Avoid emailing confidential records. We update material when we identify a supported correction.